SECTOR · CONSTRUCTION

Construction

Join schedule, cost, stock and cash across every project — on your device.

← All guides Zero data egress

Create a project, load your programme and cost ledger, fix the data gaps the tool finds, then read earned value and stock risk. Everything runs in your browser.

Stage 1 of 5 · Per project

Construction Hub — create a project

Each project holds its own schedule, cost, stock and procurement data. Set the contract type so the analysis fits how you are paid.

What you see

  • A create-a-project panel
  • Contract types: lump sum, item-rate / BoQ, EPC / design-build
  • Your projects, each with a completion ring

What you do

  1. Name the project and add the client and region
  2. Pick the contract type
  3. Open the project to load data

What you get

  • A project scoped to its own data
  • A portfolio view as you add more projects
  • Ready for the Data Workspace
Stage 2 of 5 · Per file

Data Workspace — load programme, cost, stock, BoM and POs

One place for every project file. The tool auto-detects the columns; you confirm the mapping.

What you see

  • Upload areas for the programme, cost ledger, stock, bill of materials and purchase orders
  • Auto-detected column mapping
  • A zero-data-retention banner

What you do

  1. Upload the programme (XER, MSP XML, CSV or Excel)
  2. Upload the cost ledger
  3. Add stock, BoM and PO files as you have them
  4. Confirm the auto-detected columns

What you get

  • Every file processed locally, nothing sent anywhere
  • Schedule and cost joined on the WBS
  • Data ready for reconciliation and earned value
Stage 3 of 5 · Before you trust the numbers

Readiness & Reconciliation — fix the data first

Before any index is shown, the tool checks whether schedule and cost reconcile, and ranks what to fix.

What you see

  • A readiness view of what does and does not reconcile
  • Ranked corrections to make at source
  • An "unlock more insight" panel showing what to upload next

What you do

  1. Work down the ranked corrections
  2. Fix them in your source file
  3. Re-upload and re-check

What you get

  • Confidence the earned-value numbers rest on clean data
  • A clear list of what to upload next
  • Full control — nothing is changed behind your back
Heads up. The tool never silently rewrites your data. It tells you what to fix and you correct it at source.
Stage 4 of 5 · Ongoing

Earned Value — SPI, CPI and forecast at completion

The performance picture: schedule and cost indices, and where the project lands if nothing changes.

What you see

  • A status-date control
  • Headline indices: SPI, CPI and the forecast at completion (EAC)
  • The variance behind each number

What you do

  1. Set the status date
  2. Read the indices and the forecast
  3. Trace any variance back to its WBS

What you get

  • A defensible view of schedule and cost performance
  • A forecast at completion you can act on
  • Numbers calculated on your device from your ledger
Stage 5 of 5 · Ongoing

Stock & Procurement — shortages and tied-up cash

Where materials will run short against the programme, and where working capital is sitting idle on site.

What you see

  • Predicted shortages against the schedule
  • Slow and dead stock (seasonal patterns excluded)
  • Supplier and purchase-order context

What you do

  1. Review predicted shortages and act before they bite
  2. Free up cash tied in slow-moving stock
  3. Prioritise the POs that matter to the programme

What you get

  • Advance warning of material shortages
  • Working capital recovered from dead stock
  • Procurement aligned to the schedule

Track and Prove — the Construction add-ons

What you set up here is the Plan: schedule, cost, stock and earned value, all on your device. Two optional add-ons extend it along the project lifecycle.

Both add-ons store their shared record on our servers in the region you choose (EU or US); the construction plan itself never leaves your browser.